AC 43.13 pg4-13 par 4-54 b.
Reheating at Temperatures Above Boiling Water. Reheating of 2017 and 2024 alloys above 212 °F tend to impair the original...
Announcement
Collapse
No announcement yet.
User Profile
Collapse
-
Last edited by Sir Newton; 02-27-2021, 12:59 AM.
-
Beahawk 5 Rivet Kit Material List
Good Day to all the happy people, If you are grumpy, cheer up it's heathier for you! I am sharing my preliminary rivet & celeco order from Hanson...You do not have permission to view this gallery.
This gallery has 1 photos.
- 2 likes
-
I double checked my interpretation / calculations of the dimensions from the drawing. I am correct. However there's interference on either end of the...Last edited by Sir Newton; 02-17-2021, 12:56 PM.
-
After owning my PA-140-28 for 20+ yrs. Flying it all over God's great earth. Flying little tiny airplanes is a hobby. Weather you want...
- 2 likes
Leave a comment:
-
Good evening nothing out of the normal Just general cheerleading. Figured I would show you where I'm at on my right hand for rear spar & I moved to...
- 3 likes
Leave a comment:
-
Really making big progress now. Spars are going to be assembled very quickly on this jig. I could not find any measurable deficiencies with is jig. The...
- 7 likes
Leave a comment:
-
Hello, we have had some really cold weather here in CYQU - 45°C Craziness. However no fear here! We are all done pre drilling all spar caps. Moved on...You do not have permission to view this gallery.
This gallery has 4 photos.Last edited by Sir Newton; 02-07-2021, 10:34 PM.
- 3 likes
Leave a comment:
-
Figure I post a weekend cheerleading picture. All layouts have been confirmed & drilling has commenced. Used a laser level to level the entire assembly...You do not have permission to view this gallery.
This gallery has 4 photos.
- 3 likes
Leave a comment:
No activity results to display
Show More
Leave a comment: