Tell us what you did today on your Bearhawk Project

Bcone1381

Finished Patrol
What did you do on your Bearhawk Project Today? We all want to know, and look forward to your infectious perseverance to help spur the rest of us along.

I am working on Nose Ribs today.
 

Attachments

  • photo1654.jpg
    photo1654.jpg
    1.4 MB · Views: 1
  • IMG_1707.jpg
    IMG_1707.jpg
    1.3 MB · Views: 0
Last edited:
I researched two places to fly within walking distance of the beach, after learning that I probably wouldn't be able to find a place to land on the beach legally, and I initiated my insurance renewal, thankfully at about a 15% discount from last year.
 
Worked on the firewall flange (not NEARLY as good as Jon mounting his wings... :-) I had tried to use a combination of a mallet and form, fluting pliers, and a shrinker to bend the stainless steel firewall flange. After several hours of frustrating non-progress, I cut the pseudo-bent flange off and made an aluminum flange like the QB kit. WAY easier and it looks good.
 
Finished labeling the instrument panel. Used the DecalProFx system which looks good when it comes out right but has a steep and somewhat frustrating learning curve. Some of the labels took many tries to get right and a couple worked good the first try.
 
Final drilling and taking down windshield and nose cowl installation. Getting them ready for prime and paint. Brent is modding our seats as the seat back angle adjuster was flexing and bending. So adding some more steel to that! He has one fixed and just need to weld on the other one.
 
(Untitled)

I wouldn't use this as an example of "infectious perseverance", but routering and polishing spar attach plates.
 
I worked on brake and fuel lines. I also took the springs out of my struts to test the gear travel for any binding. I know some people have fabricated U-Joints at the strut bottoms to prevent binding. The springs will max out at 2.5" compression. I has happy to find that my gear and struts move freely for the entire 2.5". So there's no need for any U-joint modification for me.

It is rather infections to see all the process you are all making! Cool stuff guys!
 
(Untitled)

Taking a lunch break.

23b94e8429965cbf57b0ebe80ff23e66.jpg

1c0612ae43faef9d3294659df67ec086.jpg

5b983a9d71e38a9e50ead57aeef642cf.jpg


Anyone have a pic of their plane similar to this:
6a506e5a42d761f6e8697e2707759394.jpg


Have the dihedral set at 1* and it looks way more pronounced than the other BH I have experience with which looked almost flat.
 
This week I built the engine mounts, added all the structure to the bottom of the fuselage for the cowl and covering. The instrument panel , pilot side of the boot cowl and tunnel are skin clipped in place. I still have one side to finish on the boot cowl. That should be done tomorrow.
 
No Title

This morning I am reinforcing the edges of my center rib form block with epoxy. This afternoon I think it's gonna take a pounding.

I am making parts making phase. Someday I will run out of parts and will start an assembly process. To see you guys taking a completed assembly and attaching it to another assembly....well, I feel like a student pilot learning who has not yet soloed, and looking up to the instructor thinking "some day I am going to be there too, but I can't believe it!"
 

Attachments

  • photo1655.jpg
    photo1655.jpg
    240.9 KB · Views: 0
No Title

Working small parts while I am waiting on my tubing kit.
 

Attachments

  • photo1656.JPG
    photo1656.JPG
    303.3 KB · Views: 0
  • photo1657.JPG
    photo1657.JPG
    258.1 KB · Views: 0
You're not a wimp!

My wife recalls working with me to fit the wings and lift the engine as the two most stressful times in our relationship... and we have children :P
 
Today I tightened up all 36 screws on my cylinder head covers.
They were all just finger tight after 400 hrs of thermal cycles, and one had started to blow a little old or "smoke".
 
Last edited:
Last weekend I put on some proper size tires! (26" Goodyear "blimp" tires) to replace the 7.00x6's. And I installed Vortex generator's. (STOLspeed).
 
Mark, I'm traveling on business this week but will post some numbers next weekend when I am home. I took data before, after installing VG's on horiz stab, and after installing on wings.

Short version of the results:
- VG's on horiz stab had no discernible impact on stall speed (as expected) but did give a bit more elevator effectiveness at slow speeds.
- VG's on wings lowered stall speed (IAS) by about 4-5 MPH. Also reduced top speed by about the same.
 
I was looking at the forum pictures where Whee is attaching the wing. I want to understand something about the attach process. I did not see the strut in the picture. I assumed that the dihedral would only come into play when the strut is attached to the fuselage.

I was also wondering how the one degree was set. If the weight of the wing is taken off the strut - and then its location is set for the one degree; wouldn't the weight of the wing on the strut move it off the one degree set point?

Is there an offset for sag that is generally used?
 
Monday, I finished installing all the stringers, and the flight controls. Yesterday, I finished the door frames. Tomorrow, I'll start installing the nut plates for the floor boards.

Today, I'm taking the day off to take the wife and grown daughter to the airport for their "You get to build an airplane, so we get to go to New York City!" trip. (I'm quite happy with that trade-off, by the way!)
 
Stan, there is a write up on installing the wings to your fuselage on our website under the Builder's Tips section. It is a link called Additional Guidance for Drilling Your Wings To Your Fuselage. Take a look. Mark
 
(Untitled)

I got some before & afters on a 10' brake with test strips, ready to transpose the results to the full size test strips and spar webs. The setback and radius are perfect. Hopefully the first real bend next Sunday! A small victory but a while in the making.
 
(Untitled)

Didn't have a chance to take pictures but we got the wing fittings all on, quite the adventure, checked lift strut alignment and ensured the seaplane doors will clear the struts. All good! Taking the weekend off for some jet boating then next week we'll move the plane back to my place. Nice to see some progress!
 
Thursday, I drilled and riveted all the nut plates for the floor boards, then started fitting and match-drilling the floorboards to the nut plates.

Friday, I finished fitting the floorboards, and temporarily installed all of them to test the fit. That 10" drill bit came in handy for a few of the holes close to the flight controls and shock absorbers. Installed the rudder pedals and brakes. Made my first control cables (rudder cable that links front and rear pedals). Also installed the door handle springs, so now I can close the doors and they stay closed! (And then I promptly removed the doors so I could reach in easier... Some "victories" are shorter-lived than others...)

This afternoon's goal is to get all this documented in my build log, and try to get it accessible on-line.
 
Installed the engine and started the sheet metal work for the cowl.

I am not satisfied that I have the nose bowl located correctly. It currently sits flush with the front of the crank plus the ring gear flange. But I am keeping my options open to move it back.
 
No Title

Today completed the flange fluting function free from faigue. Faithfully finished on a Friday, and fanatically facing future fabrication feats.
 

Attachments

  • photo1700.jpg
    photo1700.jpg
    170.5 KB · Views: 1
Today completed the flange fluting function free from faigue. Faithfully finished on a Friday, and fanatically facing future fabrication feats.


I can't tell if your photo corresponds to your story, but it might be better to flange the lightening holes before fluting the edges....since the ribs will warp when you put the angle on the lightening holes. Or maybe you know this in which case just ignore me.
 
Just about have the master routing patterns finished for my Patrol wings. Last ones to cut out are the aileron and flap nose/pocket ribs. I laid those out on the MDF sheets last night, and they're ready for the band saw. Then I'll be ready to create the actual routing forms themselves.
 
Too Late! I never considered holding off on fluting until the lightening holes were flanged. If it warps again on the longitudinal axis, I a-flutting we will go!

Brooks
 
I fluted first, then flanged the holes, then minor fluting corrections and Bob sticking at the end.
 
Too cold in the garage to weld and I'm kinda tired of fab work at the moment. Just purchased another core engine and am now screwing around with panel design.

43c7d3a990d78f06cbfca7d4bdbe04e0.jpg
 
No Title

Aileron Push Rod. There is a story of a proud builder that brought his newly made rib to a meeting. He handed it to someone and said look how stiff it is. The gentlemen promptly bent it. I am never letting anybody near my parts.
 

Attachments

  • photo1711.jpg
    photo1711.jpg
    2.3 MB · Views: 0
  • photo1710.jpg
    photo1710.jpg
    2.4 MB · Views: 0
(Untitled)

Made a heckuva lot of sawdust tonight finishing routing jigs for Patrol wings. Sure glad I bought that shop air filter last week! MDF dust is nasty stuff. Dust mask, shop vac, and everything else going.

7960d826542500dfbe73b5533f890d07.jpg


bf1e83ff17a670c676f8e7185f16486b.jpg


f151edb2f37edf9706df8c0c25a58eed.jpg



Sent from my iPhone using Tapatalk
 
No Title

Here is a picture of my BH with the 26" Goodyears and Stolspeed VG's.

VG's brought the stall speed down almost 5MPH. I previously posted that they also hurt top speed about the same - after taking more careful data on a calm day, it really only hurt top speed maybe 1-2 MPH. Originally I had taken the top speed data on a rough and bumpy day and didn't get very good results. Overall I'm happy with the addition.

26" Goodyears are a good compromise for me - home airport is asphalt so bush wheels are not very practical. They do a nice job of absorbing the rough terrain better than the 7.00's I had on previously. Running at 12PSI - haven't yet installed "bead locker screws" but will next time the wheels are off.
 

Attachments

  • photo1718.jpg
    photo1718.jpg
    64 KB · Views: 3
I really need to get the cowling painted and add some nice accent stripes - but having way too much fun flying to bother with that right now. :)
 
Looking pretty badass Steve! I still need to get down there when it's not raining ice. Like your spots in the Oratex ads... at least it looks like yours.
 
As I mentioned in my most recent post of Having a Rib Party, I blew up my router last night when I got a little bit cocky and probably tried to cut more aluminum than I should have. I got moving a little too fast while cutting the lightening holes, the blade grabbed, the worked got crazy, I broke the teeth off of the bit, and likely overheated the field windings. Sad day for my trusty Freud! But alas, Bosch came to the rescue with a replacement! And, I got the you-blow-it-up-we'll-replace-it-anyway plan for it. You just never know when you'll need it! So back to work I go!
 
Well, I've finished the fuel line runs and made significant progress on the interior panels. I didn't care for the aluminum rear window channels, so I'm working on a set of stainless steel channels, that'll be welded in. But that's not what prompted me to pipe up.
We all have projects that we avoid. Those unknown areas that we dread, because of the consequences of a screw up. Well, Today, I boldly charged in, where angels fear to tread... Some background; The project I bought, included a Barrows O-360, built as an A1A. That configuration is 'constant speed capable', but was configured for a fixed pitch prop. The project also came with a Catto 82-48, optimized for the Patrol. Problem is, I'm going to install a constant speed prop. Yes, the Catto is available. I'll post that on the Classified section. Because it was set up for the Catto, there was a nose plug in the crank. Also, I didn't know if the inner plug was pierced, or if the inner plug was the type that could use a screw in plug. Doing something stupid here, could really screw the pooch! Putting a nick in that crank would not be good... But I dove in!
I collapsed the nose p
 
Damn! Touched the wrong spot....
I collapsed the nose plug and took it out. The inside of the crank looks great! But there was no rear plug at all... Lycoming says it's a 1 3/4" plug at the rear, so I bought one. At the local auto parts store... It went in just fine!
The task I dreaded, went smooth as possible...

I don't know what I'll be reluctant about next, but surely it'll come!

Bill
 
The last few days have been discouraging. I've spent about 16 hours producing scrap. Today I finally produce some flight hardware and it feels good. Sometimes I feel like I'll never finish the wings. Plus I'm still trying to find some of that Military Grade High Strength Aluminum Alloy. Where do you find that stuff?
Gerry
Patrol #30 Wings endlessly
 
take-offs and pattern layout calcs for my remaining spar channels. I've got access to a full sheetmetal shop for 3 days next week, I want to be prepared to make the most of it. 10426830_983699135052237_2475143281407367041_n.jpg
 
Last edited:
No Title

Just made push rod for Garmin pitch servo. Pretty straightforward. Will need to beef up floor under both servos. The roll servo is going to take a little more head scratching.
 

Attachments

  • photo1781.jpg
    photo1781.jpg
    68.2 KB · Views: 0
Finished welding Aileron Flap control at wing root. Started leveling 2x4 for laying out cap strips on main spar
 
Finished bending up the rest of my spar channels. Also bent up all the .032 rib attach angles.
 
Mark, where did you end up getting your cap strip materials from? Did you buy a sheet and rip it yourself, or find some 1/8" strips ready to cut?
 
Vans Aircraft. Basically we got lucky. Caught them at the right time. They're just down the road. If you have a kit manufacturer near you it's worth checking.
 
I just finished a session of the same. Got a few more nights work to go on mine, I can only do a couple before my hand craps up from holding the file.
 
If you're going to do a bunch of nutplates, and don't already have the proper sized nutplate jig, I would HIGHLY encourage purchasing one (or borrowing one from someone who has one near you). It makes the job far less tedious, and even (a little bit) fun. I did all my aluminum floorboard attachment with nutplates so I can remove the floor for maintenance access. Aircraft Spruce has them in various sizes, so make sure you get the right ones for your nutplates.
 
Holy Smokes. Where do they all go? I thought the wing was bad with all of them called for in the fuel tank cover and inspection holes! Looks like you are about 8 years ahead of me.
 
No Title

Hello there! A short report on my project Patrol #314. The bottom part of the fuselage almost prepared for welding
 

Attachments

  • photo1827.jpg
    photo1827.jpg
    9.1 KB · Views: 1
  • photo1828.jpg
    photo1828.jpg
    8 KB · Views: 1
  • photo1829.jpg
    photo1829.jpg
    2.6 MB · Views: 1
No Title

Also were ordered ribs, main spar and rear spars. All cap strips and plates are ready.
 

Attachments

  • photo1830.JPG
    photo1830.JPG
    964.1 KB · Views: 0
  • photo1831.JPG
    photo1831.JPG
    1.4 MB · Views: 0
  • photo1832.JPG
    photo1832.JPG
    1.6 MB · Views: 0
  • photo1833.JPG
    photo1833.JPG
    1.4 MB · Views: 0
  • photo1834.JPG
    photo1834.JPG
    1.5 MB · Views: 0
  • photo1835.JPG
    photo1835.JPG
    1.7 MB · Views: 0
  • photo1836.JPG
    photo1836.JPG
    940.2 KB · Views: 0
  • photo1837.JPG
    photo1837.JPG
    1.4 MB · Views: 0
I am laying out my main spars. So of course, my workbench is too short and I have to build a 16' worktable before I can continue.
 
Patrick, sounds like you are just a few steps ahead of me. I am interested in see how you lay things out. Keep us updated with photos and techniques.

I have been making plans for bending the sheet metal for the Spars and trailing edge materials. I found a sheet metal shop whom I plan to use to shear and bend everything. It would be real nice if it got done this week. We will see.
 
I am laying out my main spars. So of course, my workbench is too short and I have to build a 16' worktable before I can continue.
You can always just use a saw horse or pull a drawer out on a properly positioned tool box. Shim it level and build away.


Sent from my iPhone using Tapatalk
 
Today I finished drilling main spar strut attach steel fittings and finished fabbing all vertical spacers and drilling all rib attach angles on main spar. I am finshed drilling both main spars! And am now dismantling and deburring all pieces to set aside for priming. This week I will start on rear spars. I already have webs bent and ready to lay out cap strips I anticipate the rear spar fabbing up to pojnt of priming to takemeabout 5 weeks. I will then prepare and epoxy prime all my ribs,, rib stiffener angles,"and main and rear spar parts. Then,,,,,, start riveting!
 
You can always just use a saw horse or pull a drawer out on a properly positioned tool box. Shim it level and build away.


Sent from my iPhone using Tapatalk
I just supported one end on the hood of my car. Because it slopes you just back it up until everything's level. But you gotta watch out for cold weather, your tire pressures go low and all of a sudden everything is tilted over!
 
I built a box-beam out of 2 sheets of MDF. It is currently laying on my workbench, which makes it a little tall, so I would like to drop it onto sawhorses. The main problem now is the box-beam is 16' and my workshop is 17' Putting it on sawhorses will require it to be directly in front of the door on each end of the shop, severely limiting access.
 
That. Is. Awesome! You totally got me. Now I'm gonna have to really set mine up on the car and scratch up the hood just to prove I did it. It's called scratch building for a reason!
 
No Title

Finished up the rough cowling as far as I could for now. Just about done with the engine plenum, then back to the carb box intake, carb heat, etc...
We are in the dead of winter, so I can spend all day in the shop if I really want too.
 

Attachments

  • photo1898.JPG
    photo1898.JPG
    2.6 MB · Views: 1
I started drilling the right front spar for all the fittings and cap strips. I'll post some pictures one of these days.
 
No Title

Not quite a Bearhawk, but I had to take some time out from building....
 

Attachments

  • photo1899.JPG
    photo1899.JPG
    499 KB · Views: 0
  • photo1900.JPG
    photo1900.JPG
    576.1 KB · Views: 0
No Title

My layout table and fitting it into my shop.

The layout table is only sitting on the drillpress table for a support. There is not enough room to drill the spars as it sits now.
I got tired of working on such a high platform, so I ended up cutting it down to 14' long and put it on sawhorses (new picture attached).

I have not decided how I will drill all the holes yet. I would like to use the drillpress, but may opt for one of the portable drill guide attachments.
I'll update when I figure that out.
 

Attachments

  • photo1901.jpg
    photo1901.jpg
    1.4 MB · Views: 0
  • photo1925.JPG
    photo1925.JPG
    550.1 KB · Views: 0
  • photo1926.JPG
    photo1926.JPG
    145.2 KB · Views: 0
  • photo1927.JPG
    photo1927.JPG
    171.2 KB · Views: 0
Last edited:
I've been fabricating interior panels, for the past month. Just about done with them. Pulled all out. Finish drilled, finish trimmed, labelled locations and piled them up. It's quite a pile of aluminum stuff! I figure it might just be time to paint the pieces, but I'm not looking forward to that. I like to shoot the paint, but hate the prep and cleanup... I'll post a couple of pics when I re-install. I've taken some pics of the bare aluminum, in place, but the reflection makes for more confusion than clarity.

Bill
 
I am at a similar point on the patrol. I have been at that point for some time. Some of the builders drill out the cap strips using a jig for spacing out the 1.021 holes. The only real dimension to hold (on the patrol) is 12.25 inches between the rib locations. The 1.021 is an artifact of placing 12 rivets in the space of 12.25 ie. 12.25/12.

From your pictures, it does not seem to require a jig for pre manufacture of cap strip holes. Could you describe the order of operation for your drilling?

Specifically, I want to know how you can slide the two c channels across the drill without the splice, or are you using a hand drill with a bubble level and not moving the channel(s)? Also, I would like to know:
Did you drill the capstrip holes on the attach plate and then drill into the cap strips?
Are placing the front side cap strips under the spar before drilling as in the procedure that eric used?
 
Too cold in the garage to weld and I'm kinda tired of fab work at the moment. Just purchased another core engine and am now screwing around with panel design.

43c7d3a990d78f06cbfca7d4bdbe04e0.jpg


Whee, where'd you find the files for the various devices to layout? Just Google-Fu?


Sent from the 4th floor men's room using Tapatalk.
 
Garmin and GRT have full size images you can print off on their websites. The other things I just resized the images to the correct size.
 
I started drilling the spar caps, 4 at a time.
I put rivets in every 6-8 in to keep everything aligned. The board on the right of the drill bit is to hold down the strips and keep shavings from going between. The vacuum hose helps keep things clean. 3 hrs and about 1/3 done


Patrick H
 

Attachments

  • ImageUploadedByTapatalk1453955330.8987.jpg
    ImageUploadedByTapatalk1453955330.8987.jpg
    333.9 KB · Views: 0
  • ImageUploadedByTapatalk1453955331.3145.jpg
    ImageUploadedByTapatalk1453955331.3145.jpg
    345.3 KB · Views: 0
Mounted the 8.50x6 tires on the wheels, and then got the wheels on the Patrol fuselage. So now it is finally sitting on its own feet! Finally able to put away the sawhorses and can move it around the shop. Still working on the brakes, but it is actually easier to work on it this way than how it was before.
 