MVP! Both flaps completed! Ailerons are next up!
Announcement
Collapse
No announcement yet.
Both Flaps Completed!
Collapse
X
-
Both Flaps Completed!
You do not have permission to view this gallery.
This gallery has 2 photos.Dave Bottita The Desert Bearhawk
Project Plans #1299
N1208 reserved www.facebook.com/desertbearhawk/Tags: None
-
I'm tellin' ya Dave, between you, a guy near me building a LSA (works full time and built the wings in <6 months, from scratch) and the two Russian guys, you should all get together and start a factory or something. A bunch of "speed hawkers"..lol
It just goes to show, the planes don't build themselves, you have to work at it.
Great job!John Massaro
Plans Building LSA - 091
Arizona
- Likes 1
-
Way to go Dave. You flew through those flaps.John Snapp (Started build in Denver, CO) Now KAWO -Arlington Washington Bearhawk Patrol - Plans #255 Scratch built wing and Quickbuild Fuselage as of 11/2021. Working on skinning the left wing! -Ribs : DONE -Spars: DONE, Left wing assembly's: DONE., Top skins : DONE YouTube Videos on my building of patrol :https://m.youtube.com/user/n3uw
Comment
-
Looking good Dave, make sure you file any over hanging aluminum on the ends of each flap down so you have a nice rounded contour for the fabric instead of a sharp edge. They look great. It feels god to have your first real airplne parts. Major progress for sure, keep it up!
Comment
-
Thanks for the props guys! Eric, I'm on it!Dave Bottita The Desert Bearhawk
Project Plans #1299
N1208 reserved www.facebook.com/desertbearhawk/
Comment
Comment