Originally posted by Bcone1381
View Post
- Shear cuts are done free of the airframe. The measuring portion is done in the airframe, marked, then removed. With the now assembled cable, you should be able to thread it through fairleads without the bushings installed, and belly pulley banks without the pulleys installed. Kind of a pain in the butt, but working on your bench is just so much easier. Plus I made my cables, then stored them to avoid having loose cables hanging off the airframe while doing other work.
Comment