I'm ready to submit my tubing order to Wicks. They have a 10% off deal on tubing this month and are less expensive then Aircraft Spruce or Airparts. Am ordering Erics Builder Manual Volume II today. I have little experience bending tubing so this is new ground for me. My question is this, all the empennage tubing lengths except for the rudder/elevator trailing edges are 5' or less. Cheap shipping. Full length trailing edges are 80" or so, not so cheap. Could the elevator TE's be fabbed from 3 short pieces (trim tab trailing edge a seperate piece). I had planned to fab the elevators from one piece of trailing edge and cut away the trim tab after final welding. This kind of process has worked well for me in modeling and full scale. The rudder TE could be 2 short pieces with the tail light mount installed. Is any of this worth the effort or should I bite the bullet and pay the extra freight, and get full length tubes? Should I add length to the trailing edge tubes to facilitate the bending process? Working with multiple trailing edge pieces sounds cumbersome.
Gerry
Patrol #30
Gerry
Patrol #30
Comment