Why wings first?Rough order of operations:
1. Wing ribs tooling and fabrication
2. Wing spar assemblies
3. Wing steel weldments
4. Wing final assembly
5. Empennage weldments
6. Fuselage weldment
7. Landing gear weldments and install
8. Control system weldments and install
Can't really see beyond that.
Just my .02.
Get Eric Newton's books.
Read the drawings until you can visualize the components while in bed at night.
Good Luck
Gerry
Patrol #30