Hi everyone! I am a new builder who is just starting out on the 4-place Model B...
I am now working on a set of templates for the ribs, and have a question about the center ribs #6 through #10. Looking at the plans, the rear aileron cable passes through these ribs on its way to the bellcrank on the aileron drive linkage. The plans make provisions for the cable in the way of a 1/2" clearance hole in the .032 ribs #1 through #5 (with the special "D" lightening hole), but make no mention of this clearance hole in the .025 ribs. It seems like the cable will pass straight through the flanges of the rear lightening holes of ribs 6 - 10 if I cut them out according to the plans...but is passing a clearance hole through a flange really a good idea, or should I alter the size of these particular lightening holes to accommodate the clearance hole?
Thanks,
Tim
I am now working on a set of templates for the ribs, and have a question about the center ribs #6 through #10. Looking at the plans, the rear aileron cable passes through these ribs on its way to the bellcrank on the aileron drive linkage. The plans make provisions for the cable in the way of a 1/2" clearance hole in the .032 ribs #1 through #5 (with the special "D" lightening hole), but make no mention of this clearance hole in the .025 ribs. It seems like the cable will pass straight through the flanges of the rear lightening holes of ribs 6 - 10 if I cut them out according to the plans...but is passing a clearance hole through a flange really a good idea, or should I alter the size of these particular lightening holes to accommodate the clearance hole?
Thanks,
Tim
Comment