Made the gasket for the gear struts (sorry forget to take a photo)
Screwed in the front floorboards for the last time
Put torque seal all the nuts that need inspecting for preflight and annual condition inspection
Set the auto-pilot servo arms with the stick in the neutral position both fore/aft and left right
I have the servo limiting brackets on both the roll and pitch servos, so I set the servo in the middle and adjusted the arms for the neutral stick position. The roll servo arm is not cotter pinned as there is a slight chance it might need to be adjusted once the wings are on and the ailerons are rigged.
Air vents are plumbed
As far as I can tell the only things needed to be done on the fuselage are to mount the prop blades (tomorrow) and bleed the brake lines later this week.
I built wing cradles this week and they are all secure on stands.
Let the wing fun begin.
For the record I started building on October 1st, 2021. I travel for work in blocks of weeks from 2-6 weeks at a time totaling 22-24 weeks a year. I have taken less than 10 days off when I have been home during the whole build process. Many times in the winter I only get to the hanger about 2pm as we ski most mornings (make sure you keep your spouse happy during the build). Why am I stating this? To give folks an idea of build time. I was a COMPLETE neophyte when I started my build, I was totally delusional on the time it would take to complete. I hope this might help someone on the fence. Building a plane is not hard, but can be frustrating, stick to it and you can do it.