After moving 40 years of old parts and junk, then a lot of cleaning, putting up new lights and installing a new heater I moved the airplane into the old farm shop that dad and I build in 1976

After moving, I worked on skinning doors and working on windows.

The brakes and parking brake have been permanently been installed, along with the fuel system in the cockpit and fuel lines to the firewall.
I

Different items like the injectors, alternator, backup generator, ignition coils, hall sensors, and flywheel magnets

have also been installed on the engine.
When I look back through the photos I can tell that progress has been made. I am very grateful to this forum and the fellow builders in this area for the help they have offered. Dean who has worked as an avionic tech and is building his second airplane, has been designing the electrical system and has helped me with sheet metal work, Keith who is an AI and restored several airplane has provide encouragement and given instruction on many skills such as safety wiring and riveting and continues to inspect my work and advise. This project has been a fun journey.