Ok this is the second part.
I was also able to close up the holes around the landing gear struts by using left over baffle material. It's not perfect but if I go for perfect on everything this plane will never fly.
Adding Pics of what I did.
While doing this task I realized that my exhaust tunnel was not going to fit without cutting a hole for my gasolator in the tunnel panel. After some phone conversations I decided it was best to relocate it so I would only have a hole just big enough fir the drain. The gasolator was going to stick out about 1 1/16" and be right where the exhaust pipes dumped. Adding before and after pics.
What's next? I was trying to time my mags but found out that there is an issue with both mags. When I get those back and installed I will be putting the oil cooler and all controls on the engine, put the avionics panel in hang the prop and turn the plane in my shop and hang the wings to fit everything. Do my fuel flow test and my weights for my CG. After that I should be ready to pull the wings and take it to the airport and get my DAR.
Hope y'all like the update.
I was also able to close up the holes around the landing gear struts by using left over baffle material. It's not perfect but if I go for perfect on everything this plane will never fly.

While doing this task I realized that my exhaust tunnel was not going to fit without cutting a hole for my gasolator in the tunnel panel. After some phone conversations I decided it was best to relocate it so I would only have a hole just big enough fir the drain. The gasolator was going to stick out about 1 1/16" and be right where the exhaust pipes dumped. Adding before and after pics.
What's next? I was trying to time my mags but found out that there is an issue with both mags. When I get those back and installed I will be putting the oil cooler and all controls on the engine, put the avionics panel in hang the prop and turn the plane in my shop and hang the wings to fit everything. Do my fuel flow test and my weights for my CG. After that I should be ready to pull the wings and take it to the airport and get my DAR.

Hope y'all like the update.