I’m thinking the sequence goes something like this:
install the bearings. (Done)
Drill the 3/16 holes in the sheet metal hinges.
Bolt the sheet metal hinges onto the bearings.
Use the plywood template to get the control surface in position.
Mark the location of the hinge mounting holes on the control surface spars by marking through the holes in the sheet metal hinges onto the spar.
Drill holes in spars.
Unbolt sheet metal hinges from bearings and bolt them permanently to the spars.
Use similar technique for pushrod attachment
store control surfaces until ready to add weights and covering.
2 questions: do I have this about right? And, are there any good tricks to insure accuracy or provide greater confidence while drilling?
install the bearings. (Done)
Drill the 3/16 holes in the sheet metal hinges.
Bolt the sheet metal hinges onto the bearings.
Use the plywood template to get the control surface in position.
Mark the location of the hinge mounting holes on the control surface spars by marking through the holes in the sheet metal hinges onto the spar.
Drill holes in spars.
Unbolt sheet metal hinges from bearings and bolt them permanently to the spars.
Use similar technique for pushrod attachment
store control surfaces until ready to add weights and covering.
2 questions: do I have this about right? And, are there any good tricks to insure accuracy or provide greater confidence while drilling?
Comment