Prepping for the wingtip attach
Lots of tape put down and lines drawn for drilling.
I also posted in the General Section about spacing, I can either go with 2 15/16” or over 4”. Spacing is determined by the rivets as the nutplates have to go between rivets.
IMG_5335.jpg IMG_5334.jpg
Announcement
Collapse
No announcement yet.
Kit #7 arrived
Collapse
X
-
kestrelOriginally posted by kestrel View PostWhat is the power supply that you chose? How was it chosen?
Thanks!
I did a ton of research as I disliked batteries running out. The product I am using used to be FlightFlix, but FlightFlix was sold. The original owner kept the technology and he is GREAT to deal with.
I wired my panel with a “Camera” rocker switch so I can control things. I don’t want to post Ryan’s phone number online, but if interested PM me and I will send it to you.
Super easy to wire, and weighs next to nothing.
Jay T
- Likes 1
Leave a comment:
-
After all the holes were match drilled, they were upsized for the #6 screws
Next was installing the nut plates in the backing plate followed by using click bond to install it.
IMG_5323.jpg IMG_5324.jpg
Drilled the hole for the fuel tank Curtis drain, it was off by about 1/64th” so a bit of sand paper on one side made for a good fit.
IMG_5322.jpg
- Likes 1
Leave a comment:
-
The long awaited drilling and multiple match drilling took place today
IMG_5316.jpg IMG_5315.jpg IMG_5317.jpg
And then the lens gets drilled, this was a bit tricky as I could see the holes underneath pretty well
IMG_5318.jpg IMG_5319.jpg IMG_5321.jpg
Leave a comment:
-
Jay: I am getting ready to install conduit in the wing like you. Is there a reason you did not keep the conduit in the leading edge ribs for the whole run?
Leave a comment:
-
Conduit for the wing wiring is installed, multiple purple para cord has been fished through to pull wires when ready. The OAT to Magnetometer has been run through a protective tube and run to the wingtip
IMG_5308.jpg IMG_5306.jpg IMG_5307.jpg IMG_5305.jpg
Fuel tank is in place to get the lines for the sump drain
IMG_5304.jpg IMG_5309.jpg
Leave a comment:
-
I had been putting off the last 5 inspection covers and the nutplates. But today was the day, all are done, and 4 of the 5 are riveted to the skin (no photo), the 5th I purposely left as I need every bit of space to put in the conduit for my wiring.
IMG_5296.jpg IMG_5294.jpg
Leave a comment:
-
-
Fuel panel is all upsized to #6 screw size, nearly half of the nutplates are installed
IMG_5280.jpg
Did my first inspection panel installation including the nutplates
IMG_5281.jpg IMG_5282.jpg IMG_5283.jpg
Nutplates are mind numbingly boring.
Now that the first went well, I will assembly line the last 5.
Leave a comment:
-
The progression of a day of building a “shade” for my light.
IMG_5259.jpg IMG_5262.jpg IMG_5263.jpg IMG_5264.jpg IMG_5265.jpg IMG_5267.jpg
- Likes 4
Leave a comment:

Leave a comment: